Project Portfolio

Results that are proved, not claimed

A sample from 240+ closed improvement projects — each with a clear problem, structured methodology, and quantified outcome.

PRODUCT · Quality

Appliance Condensation Elimination

Before3% Field Complaints
After0% Field Complaints

Opex + DOE used to identify and eliminate root cause. Solution locked into engineering design standard.

MANUFACTURING · Cost

Pallet to Palletless Door Kit Process

BeforeCpk 1.0
AfterCpk 1.6 — $2.6M savings

Packaging redesign validated through DOE. Complexity reduced, quality improved, major cost savings delivered.

PRODUCT SHIPMENT · Cost / Quality

Door Latch Damage — EPS Resolution

Before$4.5M latch damage TRS cost
After$4.5M cost saving achieved

Root cause identified through structured analysis and DOE. Engineering countermeasure validated and standardised.